Guidelines for Examination
PART A
CHAPTER III EXAMINATION OF FORMAL REQUIREMENTS
12. Designation of Contracting States
12.6 Request for Grant form
 

HOME

E  /  D   /  F

 

 
 
PART A
CHAPTER III EXAMINATION OF FORMAL REQUIREMENTSCHAPTER III EXAMINATION OF FORMAL REQUIREMENTS
12. Designation of Contracting States12. Designation of Contracting States
  12.5 Application deemed to be withdrawn12.5 Application deemed to be withdrawn     12.7 Indication of the Contracting States12.7 Indication of the Contracting States  
 

12.6

Request for Grant form

 

The designation of the Contracting States in which protection for the invention is desired shall be contained in the request for grant of a European patent, whereas the designation fees may be paid later.

 

Art. 79(1), (2)



The use of the prescribed Request for Grant form (Form 1001) with its pre-crossed declaration designating all Contracting States belonging to the EPC at the filing of the application (Section 32.1) ensures that all designations are made on the day the application is filed, giving the applicant time - until expiry of the period for paying the designation fees (Art. 79(2), Rules 15(2), 25(2) and 85a(1), (2)) - to decide which Contracting States he actually wants his patent to cover. This he does by paying the designation fees for those States, including any surcharge(s).